Building progress is very evident now that the builder is not at the mercy of this crazy spring weather. Siding, insulation and sheet rocking are full speed ahead at about -60 days and counting. These pictures were taken on 4/20/09

R-19 insulation isolates the cathedral ceiling of the great room from the non-cathedral attics on both sides of the great room



Neatly packed and channeled wiring through the basement ceiling, something not typically done by most builders

Detail of wall insulation covered with plastic

Picking the color of siding from a tiny sample is one of the most challenging choices when building a home. This time we are very pleased with our choice, which looks like a perfect match with the trim, roof, and the setting of the house.