Saturday, April 11, 2009

INTERNAL PROGRESS

We have stairs to the basement now.

The house is now "dried in", which means the roof is mostly completed and windows and doors are in place. Progress is now evident inside as you will be able to see in the following shots. We have chosen the location of switches, electrical outlets, lights and TV hookups.
Yesterday we also received the good news that, baring any unexpected circumstances, we will be able to move in or around June 16th.

Basement bathroom with shower/tub combo

Equipment/laundry room showing sink and washer plumbing

Energy efficient water heater in place. Main water line into the house is on the bottom left with copper plumbing coming up from there. Furnace will be placed to the left of the main water line.

Master bathroom: jetted tub on the right and double sink set up to the left of it.

Entry way to Master bathroom and jetted tub

Upstairs guest bathroom with shower/tub combo

Great room: corner fireplace location (opposite kitchen) with recessed arched area where TV will be located.