Sunday, March 08, 2009

BUILDING PROGRESS

Floor/ceiling joists. The long tool the worker is holding is a glue gun as they glue and nail the floor to the joists

Detail of joists and framing around basement window looking towards to the North

Basement framing: bathroom on the left, guest bedroom in the background, sewing studio in the foreground


Framing around the future stairs to the basement

Opening in the joists for the stairs





Mama standing in her sewing studio inside the he basement door


Outside view of the basement window that faces the street (north) and retaining wall next to it. floor/ceiling joists run east-west along the width of the house.






1 comment:

  1. I am enjoying this process. It is always nice to have a good builder. Yay Kaski!
    Linda

    ReplyDelete